We manufacture plastic, polyester, metal(Brass,nickel, aluminum), invisible polyester zipper and pre-formed brass zipper.# 3, # 4, # 4.5, # 5. On special requirement #8, #10, zippers can be supplied.

The delivery time depends on the quantity, type, no. of colors, any special slider etc.Generally for regular zipper and reasonable quantity : 2 weeks.We can always start doing partial delivery for bigger orders.All orders are delivered at your door step by us in Bangladesh.

The minimum quantity is based on color and size.In general minimum quantity that we can cater on per color basis :
     
Open-end 20 Inch
Close-end 6 Inch
     
Polyester Close-end # 3 400 pcs
Polyester Close-end # 5 250 pcs
Polyester Open-end # 5 90 pcs
Plastic Close-end # 3 500 pcs
Plastic Close-end # 5 400 pcs
Plastic Close-end # 3 170 pcs
Plastic Close-end # 5 150 pcs
Metal Close-end # 3/# 4.5 450 pcs
Metal Close-end # 5 350 pcs
Metal Open-end # 5 120 pcs

If quantity is less than above we still can cater but an up-charge of USD 50/color to be added to the price.

It varies for different type of zippers
     
Polyester Open-end 5 inch
Polyester Close-end 3 inch
Plastic Open-end 13 inch
Plastic Close-end 8 inch
Metal Open-end 2.5 inch
Metal Close-end 8 inch

2-3 days but can be made earlier

NEO has its own color card. You can use color reference from there.You may use any other color reference as we can follow any.Our suggestion is to use the fabric swatch as color reference

We have test reports available of two types :

a) Test reports from International Testing Laboratories: ITS, MTL, SGS
b) NEO in-house test reports

Moreover, we can do any test for you if you require

Yes. We can only sell to export oriented manufacturing units if you are in Bangladesh. In case of exporting to other countries we have no such bar.

All payments are to be made by irrevocable L/C without recourse at sight/60 days/90 days sight. If payment is by 60 days or 90 days sight L/C, then appropriate interest to be paid.You can also pay by advance T/T. All payments must be done in US Dollar. This is only for Bangladesh. For overseas, we only accept L/C at sight and/or advance T/T in US Dollar.

Yes, in case to buy zipper from us in Bangladesh you need to provide us U.D.of your apparel raw material consumption. We need this to submit to Bangladesh Customs.If you are an Export Processing Zone manufacturing unit (Example CEPZ, DEPZ), then you have to provide us with Import Permission (I.P.)

For exporting outside Bangladesh no such is needed.

Yes, we can do any type of OEM/Private Label or Rubber puller if you provide us the design.

Design development : 7 days
Slider manufacturing : 21 days
Shipping time by sea : 21 days (If by air then around 2 days).